Why pre-screen climate adaptation architects before the portfolio review
Adaptation features cost money now against a benefit somebody else collects in thirty years, which is why they lead the value engineering list when the tender comes in over budget. The architects who matter can make the case in cost and risk terms and have won it at least once. A short screen asks what was cut from a project and what they managed to keep.
What actually matters when screening Climate Adaptation Architect candidates
- 01
Technical depth
Check command of climate risk modelling in design: UKCP18 or CMIP6 downscaled scenarios, overheating analysis to CIBSE TM59 or ASHRAE 55, flood zone mapping, urban heat island modelling.
- 02
Work that shipped
Ask for named buildings or masterplans delivered: RIBA stage reached, adaptation measures built (raised plant, SuDS, blue roofs, shading), and measured post-occupancy performance.
- 03
Diagnosis under uncertainty
Probe how they handled conflicting projections, missing local hazard data, or a client site with unquantified subsidence, coastal erosion or wildfire exposure.
- 04
Working across the org
Assess coordination with structural and MEP engineers, planning officers, insurers and cost consultants; look for evidence of defending resilience budget against capex pressure.
Pre-screening questions to ask Climate Adaptation Architect candidates
12 questions grouped by what they test. Ask the same set in every screen and score answers on a consistent scale, or send them as an async video screen and compare answers side by side.
Buildings completed
3 questions01What experience do you have designing for climate adaptation?
Listen forCompleted buildings with adaptation measures in the final specification, and their role described.
Competition and concept work only, or measures removed before construction began.
02Can you describe your most successful adaptation project and why it worked?
Listen forSuccess defined by measured performance in use, not by awards or published images.
Success judged by recognition, or performance after occupation never checked.
03Which building types have you worked on?
Listen forSectors relevant to your work, with the differing regulatory and occupancy demands understood.
Sectors listed without depth, or experience only on projects far smaller than the role.
Designs for local risk
4 questions04What experience do you have designing for specific risks such as flooding or heat?
Listen forLocal projections used, with flood levels and overheating modelled rather than assumed.
Generic resilience measures applied, or local hazard data never consulted.
05How do you incorporate adaptation measures into a project?
Listen forAdaptation built into orientation, form and structure early rather than added as systems later.
Adaptation delivered by mechanical cooling, or measures introduced after planning approval.
06How familiar are you with energy-efficient building design?
Listen forFabric performance and passive strategy prioritised, with the tension against overheating understood.
Efficiency pursued through insulation alone, or summer performance never modelled.
07Can you describe a project using low-impact technologies or materials?
Listen forMaterials chosen with durability and maintenance load considered alongside their environmental profile.
Materials selected for their story, or maintenance requirements not discussed with the client.
Performance measured
3 questions08How have you improved the environmental performance of a project?
Listen forMeasured improvement after occupation, with the gap between design and reality acknowledged.
Performance quoted from design models only, or no post-occupancy data ever gathered.
09Have you worked on an adaptation project that did not succeed?
Listen forAn honest failure with what they learned, whether commercial, technical or in use.
No project that fell short, or failure attributed entirely to the client or contractor.
10How familiar are you with climate policy and building regulations in this region?
Listen forCurrent requirements known, including where they are tightening and what that means for design.
Regulations known from another jurisdiction, or compliance treated as a consultant's task.
Survives cost cutting
2 questions11How do you handle budget constraints affecting the adaptation elements?
Listen forThe case made in whole-life cost and risk terms, with priorities set before cutting begins.
Measures cut first when budget tightens, or no argument prepared for the cost review.
12How do you manage compromises between client expectations and adaptation goals?
Listen forTrade-offs discussed openly early, with consequences documented when a client declines a measure.
Client wishes accepted without challenge, or disagreements handled by removing measures unannounced.
How to score responses
Score every candidate on the same four criteria immediately after the screen. At this stage you are shortlisting for panel interviews, not making the final call.
Technical depth
35%5Names specific scenario data, weather morphing tools and thermal modelling software used, and explains how outputs changed built form or fabric decisions.
Work that shipped
30%5Cites completed schemes with adaptation features that survived value engineering, plus post-occupancy or monitoring data proving performance.
Diagnosis under uncertainty
20%5Describes explicit assumptions, sensitivity testing across scenarios, and design decisions kept reversible or upgradeable as evidence improved.
Working across the org
15%5Gives concrete examples of persuading developers or planners using lifecycle cost, insurability or policy arguments, not moral appeals.
Adaptation features lead the value engineering list. A one-way video screen asks what they managed to keep.
Try it on HirevireScreening FAQ
Process basics
How long should a pre-screening round for this role take?
Fifteen minutes across eight to ten questions, answered async alongside a portfolio. Enough to test completed work, risk-specific design and how they defend measures under cost pressure.
What should the portfolio show?
Completed buildings with the adaptation measures identified, ideally with measured performance data after occupation. Competition entries show design ability but not whether anything survived procurement.
Evaluating answers
What is the strongest signal when screening this role?
What was cut and what they protected. Architects who deliver adaptation describe the negotiation and the compromise. Anyone whose schemes were built as designed has not been through it.
How do I judge their technical grounding?
Ask how they designed for a specific risk such as overheating. Real answers reference modelling, local projections and measured outcomes rather than general sustainability principles.
























