Execution and reliability
Check they have run peak dinner rush in a multi-brand ghost kitchen: ask for ticket times, order accuracy rates, driver wait minutes and covers pushed per hour.
Evidence to listen for
- Describes a workload they owned and how they kept it from slipping
- Names the tools and systems they ran day to day
- Can talk about volume: tickets, inboxes, orders, uptime
- Nothing quietly falls through when they are busy
Five-point scoring guide
Cannot describe their own workload; things slip without them noticing.
Handles routine volume; drops work under pressure.
Reliable on steady-state work; struggles when volume spikes.
Consistently reliable at real volume with a system for staying on top.
Quotes real throughput numbers from named sites, such as cutting average ticket time from 18 to 11 minutes at peak.