engineering applied scienceanaerobic digestionboiler thermalcems emissionsflue gas treatmentwaste to energy
Complete evaluation framework
What to assess and how to score it
Review the evidence signals before interviewing. Then use the anchored descriptions—not instinct alone—to choose the score that best matches each answer.
01
Evaluation factor
Technical depth
35% weight
Probe command of combustion and conversion routes: moving grate mass burn, fluidised bed, anaerobic digestion, RDF calorific value calculations, boiler steam cycles, SNCR, baghouse and scrubber chemistry.
Evidence to listen for
Explains the physics or mechanism behind their work, not just the tooling
Names the standards, tolerances, and constraints they designed against
Can defend a design decision under follow-up questions
Distinguishes what they personally engineered from what the team delivered
Five-point scoring guide
1
Poor
Cannot explain the fundamentals of their own stated specialism.
2
Needs Improvement
Knows the vocabulary but not the underlying mechanism; struggles under follow-ups.
3
Satisfactory
Solid working knowledge for the role; depth thins out on edge cases.
4
Very Good
Strong command of the domain; explains trade-offs and defends decisions well.
5
Excellent
Explains grate versus fluidised bed trade-offs with real LHV, steam pressure and dioxin control numbers rather than vague process description.
02
Evaluation factor
Work that shipped
30% weight
Ask which plants or projects they delivered: commissioned lines, digester retrofits, turbine upgrades, tonnes per day throughput, MWe exported, availability percentage and payback achieved.
Evidence to listen for
Names specific programmes, parts, or systems that reached production or field use
States their own scope inside the project
Can give measured outcomes: yield, cycle time, cost, failure rate
Explains what went wrong and what they changed
Five-point scoring guide
1
Poor
No delivered work; experience is coursework, lab-only, or purely observational.
2
Needs Improvement
Contributed to projects but cannot say what shipped or what their part was.
3
Satisfactory
Has delivered real work; outcomes described without numbers.
4
Very Good
Names shipped work and their scope, with some measured results.
5
Excellent
Names specific facilities and quantifies outcomes: tonnes processed, export MWh, availability gains and emissions reductions they personally drove.
03
Evaluation factor
Diagnosis under uncertainty
20% weight
Test how they handled clinker build-up, bed agglomeration, boiler tube corrosion, unstable feedstock moisture or CEMS excursions when the cause was not obvious.
Evidence to listen for
Describes a real failure they chased to root cause
Shows a method: isolate variables, reproduce, measure, eliminate
Distinguishes correlation from cause
Says what they ruled out and why, not only what the answer turned out to be
Five-point scoring guide
1
Poor
No diagnostic method; guesses or escalates immediately.
2
Needs Improvement
Trial and error with no structure; cannot explain how they narrowed the cause.
3
Satisfactory
Reasonable method on familiar problems; less structured on novel ones.
4
Very Good
Clear systematic approach with a real root-cause story.
5
Excellent
Walks through a real upset, the data reviewed (CEMS trends, ash analysis, feed logs) and how the root cause was confirmed.
04
Evaluation factor
Working across the org
15% weight
Look for work with regulators, permits under the Industrial Emissions Directive or EPA subparts, waste suppliers, offtake contracts, plant operators and community objections.
Evidence to listen for
Explains technical constraints to non-technical stakeholders without condescension
Has negotiated scope, cost, or timeline with manufacturing, product, or suppliers
Documents decisions so others can act on them
Takes review feedback without defensiveness
Five-point scoring guide
1
Poor
Cannot communicate outside their specialism; dismissive of other functions.
2
Needs Improvement
Communication gaps cause rework; avoids stakeholder contact.
3
Satisfactory
Works adequately with other teams; documentation is thin.
4
Very Good
Communicates clearly across functions; reliable collaborator.
5
Excellent
Describes carrying a permit variation or offtake negotiation through with named regulators, operators and residents, not just engineering handover.
Put this rubric to work
Score every candidate against the same standard
Add these weighted factors to Hirevire and let AI evaluate recorded answers against your rubric.